Detailed Explanation
In time and work problems, if a person completes a job in \( n \) days, then in one day they complete \( \frac{1}{n} \) of the work. When two people work together, their one-day works add up. Here, Nishu takes some days \( x \) to finish the work alone, and Pintu takes 6 more days, that is \( x + 6 \) days. Together they finish it in 4 days, so the sum of their one-day works equals \( \frac{1}{4} \). This gives a quadratic equation which we solve to find \( x \).
Formula Used
\[ \frac{1}{x} + \frac{1}{x+6} = \frac{1}{\text{time taken together}} \]
Solution
- Step 1: Let Nishu alone finish the work in \( x \) days. Then Pintu alone finishes it in \( x + 6 \) days. Nishu's one-day work is \( \frac{1}{x} \) and Pintu's one-day work is \( \frac{1}{x+6} \).
- Step 2: Together they finish the work in 4 days, so their combined one-day work is \( \frac{1}{4} \). This gives the equation \[ \frac{1}{x} + \frac{1}{x+6} = \frac{1}{4} \]
- Step 3: Combine the fractions on the left side by taking LCM: \[ \frac{(x+6) + x}{x(x+6)} = \frac{1}{4} \] which simplifies to \[ \frac{2x + 6}{x^2 + 6x} = \frac{1}{4} \]
- Step 4: Cross-multiply to remove fractions: \[ 4(2x + 6) = x^2 + 6x \] \[ 8x + 24 = x^2 + 6x \] Rearrange to standard quadratic form: \[ x^2 - 2x - 24 = 0 \]
- Step 5: Factorise the quadratic. We need two numbers whose product is \( -24 \) and sum is \( -2 \). These are \( -6 \) and \( 4 \). So \[ (x - 6)(x + 4) = 0 \] Therefore \( x = 6 \) or \( x = -4 \).
- Step 6: Since time cannot be negative, we reject \( x = -4 \) and take \( x = 6 \). So Nishu takes 6 days alone, and Pintu takes \( 6 + 6 = 12 \) days alone.
Final Answer
Nishu alone takes 6 days and Pintu alone takes 12 days to complete the work.
Common Mistake
A common mistake is to add the individual days directly (like saying together they take \( x + (x+6) \) days) instead of adding the one-day work fractions. Always add rates of work, not the times.